Popular Food Testing


Luffa detection

Baijia.net - a professional third-party testing and inspection platform that provides relevant testing and inspection services such as loofah testing.
Product Description:

Cultivation techniques: During summer, the temperature is high and the seedlings emerge quickly. Generally, direct seeding is sufficient. Soak the seeds for 3-4 hours before sowing or induce germination for 24 hours after soaking before sowing. Single row and double plants, with hole spacing of 30-40 cm. Place 3-4 seeds in each hole, cover with soil of 1.5 cm, cover with gauze, and sprinkle with water. After emergence, leave 2 seedlings per hole&Nbsp; Due to the high rainfall in summer, the preparation of summer loofah requires deep furrows and high ridges; The width of the furrow is 1.6 meters, and the width of the furrow is 1.2 meters&Nbsp; During the seedling stage of Feishui Summer Luffa, the manure and water should be sprayed 2-3 times. During the initial flowering stage, top dressing should be applied again, with 50 kilograms of compound fertilizer or 50 kilograms of peanut bran applied per mu. After 2-3 harvests, top dressing should be applied again, with 15 kilograms of compound fertilizer, 10 kilograms of urea, and 5 kilograms of potassium fertilizer applied each time. Summer loofah seedlings should not have too much water, as too much is not conducive to root growth. During the flowering period, vines require a lot of water. On sunny days, they should be watered in the morning and evening. During the harvesting period, in addition to watering, a water layer of 10-20 centimeters should be retained in the ditch, and timely drainage should be carried out on rainy days&Nbsp; When the vine is 30 centimeters long, the bamboo can be inserted into the frame. After inserting the frame, do not immediately insert the vine. It is necessary to properly nest and press the vine. When female flowers appear, the vine can be inserted upwards and evenly distributed&Nbsp; When the shredded melon is bent, use a small packaging rope to tie the stem and a small stone to straighten the melon. It is usually done 2-3 days after picking the melon. Remove the diseased leaves and old leaves that affect ventilation and are prone to spreading diseases during the late harvest period of the summer full towel gourd. It is necessary to remove them in a timely manner&Nbsp; Timely harvesting of summer loofah takes 35 to 45 days from planting to initial harvest, with a harvesting period of 50 to 60 days. It takes about 10 to 12 days from the blooming of flowers to the harvesting of goods. Harvesting should be done in a timely manner, otherwise it may cause fibrosis and cannot be consumed, affecting both yield and quality&Nbsp

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

BAIJIAN testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Our Competitive Edge:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China

Inquiry:

CATEGORIES

CONTACT US

Contact: Mr. Li

Phone: 156-0190-2607

Tel: 400-101-7153

Email: service@Baijiantest.com

Add: No. 700, Yishan Road, Xuhui District, Shangha

Facebook

Twitter

LinkedIn

Youtube

instagram

400-101-7153

Skype

WhatsAPP

service@Baijiantest.com

Top