Where do load test inspections go? The BAIJIAN Testing Center can conduct load tests on various samples and issue third-party load test testing report
Where do load test inspections go? The BAIJIAN Testing Center can conduct load tests on various samples and issue third-party load test testing reports
Detection scope: chandeliers, billboards, safety belts, manhole covers, chain hoists, large lighting fixtures, fasteners, escalators, etc
Testing standards
1DIN EN 60512-8-2-2012 connectors for electronic equipment - Testing and measurement - Part 8-2: Static load test (fixed connectors) - Test 8b: Axial static load
2DIN EN 60512-8-3-2012 connectors for electronic equipment - Testing and measurement - Part 8-3: Static load test (fixed connectors) Test 8c: Durability of the starting lever
3DIN ISO 7797-1986 Determination of quasi-static load on off-road snow under fracture load and bending
4GT 21160-2007 Agricultural trailers - Full trailer and semi trailer payloads Determination of vertical static load and axle load
5IEC 60512-8-1-2010, Testing and measurement of connectors for electronic equipment - Part 8-1: Static load test (fixed connectors) - Test 8a: Lateral static load
6ISO 7797-1985, Determination of quasi-static load for off-road sleds under fracture load and bending
Why did we choose the hundred inspection net load test for detection1. BAIJIAN Load Test and Testing Center is a third-party testing institution with complete qualifications and CMA certification
2. Accurate data, with a doctoral team and imported testing equipment from Europe and America, ensuring the accuracy of the data
3. The research institute's testing report supports QR code query for authenticity
4. Multiple branches across the country support on-site sampling and free initial inspection
5. After sales service, relevant engineers provide one-on-one service
6, can provide testing reports in both Chinese and English, as well as MSDS report writing services
Load test detection process
1. Preliminary consultation
2. Mailing load test samples or on-site sampling
3. Engineer quotation
4. Pay for testing fees and conduct experiments
5. Complete the experiment and issue a testing report
6. Mailing inspection reports and after-sales service
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms
3. Used as a sales report: issuing legally effective testing reports to make consumers more confident
4. Papers and research: Provide professional personalized testing needs
5. Judicial services: providing scientific, fair, and accurate testing data
6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems
BAIJIAN testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations
3. Mail samples and arrange testing
4. Progress tracking and result feedback
5. Provide reports and after-sales service
6. If urgent or priority processing is required
Our Competitive Edge:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby
3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service
7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc
8. The testing report is authoritative and effective, and is generally used in China
Contact: Mr. Li
Phone: 156-0190-2607
Tel: 400-101-7153
Email: service@Baijiantest.com
Add: No. 700, Yishan Road, Xuhui District, Shangha